Bedroom Decoration
Although small, this project had its difficulties, predominantly that the works were carried out in a loft conversion. The team had to ensure that all the areas giving us access to the room were protected prior to and during the works. Alongside this, they had to maintain compliance with our Quality Procedures.
The works carried out were as follows:
• Removed all existing furniture and fittings into storage
• Prepared all walls and woodwork prior to first coat of decorations
• Punched home nails and filled floor defects prior to sanding floor
• Sanded floor with various grades of paper
• Decorated walls and woodwork with final coats
• Applied two coats of varnish to floor
• Reinstated all the soft furnishings
All the works were completed within our programme and we left yet another satisfied customer.