Hallway & Kitchen, Stanmer Park
A comprehensive hallway and kitchen refurbishment with BN1 Property Maintenance Ltd involving the following steps:
As part of the project, we undertook a comprehensive redecoration scheme for both the hallway and kitchen areas, ensuring that these spaces received a thorough and high-quality transformation. This involved applying a fresh coat of paint to the walls, ceilings, and trim, as well as replacing any damaged or worn-out surfaces with new ones.
Additionally, we carried out extensive electrical work in these areas, including the installation of new electrical switches and sockets, to ensure that all connections were safe, secure, and up-to-date. This included testing and verifying that all electrical systems met current safety standards and regulations.
Our team worked closely with the client to understand specific design preferences and create a bespoke loft conversion that meets their needs and maximizes natural light.
Please note that our hallway and kitchen refurbishment services also include:
• Ensuring the structural integrity and stability of the existing property, including any necessary supporting work to accommodate new flooring, walls, or ceiling finishes.
• Complying with relevant building regulations and securing necessary permits from local authorities to ensure all work meets current standards and codes for electrical installations, plumbing, and fire safety.
• Installation of smart home technologies, such as thermostats and lighting systems, to enhance convenience and energy efficiency in both the hallway and kitchen areas.
We also take care to preserve any original features or architectural details, where possible, while also incorporating modern finishes and materials to create a fresh and updated look that meets your needs.