Full House Refurbishment, Dyke Road

Full House Refurbishment, Dyke Road

The client required a full decoration and kitchen upgrade to their 1 bed flat.

While appraising the project it was found that the boiler was not compliant to the gas regulations. As there was no access to inspect the boiler flue.
All the surfaces not being decorated were protected prior to starting work.

One wall was stripped back and replastered prior to decorations starting. The flat was decorated which included rubbing down all the ceilings, walls and woodwork and received 2 coats of all paint applied.

The kitchen units had all the doors resurfaced and new drawer runners were installed and access panels were installed to make the boiler compliable to the latest gas regulations.

 

 

 